What Summit County homeowners actually spend on master bathroom renovations — and why national averages don't tell the full story.
Get an Honest Estimate
Cost Guide
Master bathroom remodel costs in Summit County Ohio range from $30,000 to $85,000 for a full renovation. Smaller secondary bathrooms can run $12,000–$25,000. Here's how to think about it.
Learn more about our Bathroom Renovation service.
| Scope | Typical Range | What's Included |
|---|---|---|
| Focused Update | $30,000–$45,000 | New tile, vanity, fixtures, lighting, paint |
| Full Renovation | $45,000–$65,000 | Complete gut, new layout, custom tile, soaking tub or walk-in shower |
| Spa-Level Build | $65,000–$85,000 | Heated floors, steam shower, custom millwork throughout, premium plumbing fixtures |
Breaking It Down
Size, material, and pattern complexity all move the number. Add heated flooring substrate and the cost climbs further — but it's one of the most-used surfaces in the room.
Freestanding tubs, frameless glass showers, and rainfall heads span an enormous price range. The quality gap between entry-level and mid-grade fixtures is substantial and visible every day.
Stock, semi-custom, and fully custom vanities carry very different price tags. Mirror framing and integrated lighting add refinement that changes how the whole room feels.
A walk-in shower alone, a freestanding tub alone, or both — each choice adds cost but also transforms how the space works. Most clients end up glad they made the call they did.
"A lot of homeowners get sticker shock when they see bathroom renovation costs. The truth is, a $25,000 bathroom and an $85,000 bathroom look very different. I walk every project with the homeowner before we ever design anything, so you know exactly what you're getting — and what it costs — before we start."— Adam Kilgore, AK Renovations
Every Project
For a focused renovation — new tile, vanity, and fixtures — yes. A full gut renovation with a soaking tub and custom shower typically starts at $45,000.
Tile work and custom shower configurations typically drive the most cost. A steam shower or full-height tile work can add $8,000–$15,000 on its own.
Yes. Our estimates include all materials, labor, fixtures, permits, and trade coordination.
Most projects run 4 to 6 weeks of in-home construction. We plan all material selections before demo begins.
Yes. A 15-minute walkthrough with Adam is usually enough to give you a realistic range for your space.
Ready to start your bathroom renovation?
See Our Bathroom Renovation Service →Call Adam or send a message. He'll walk through your bathroom and give you a realistic number — no design fee, no obligation.
Talk to Adam